Roundhouse Wind Energy Project

On March 18, 2019, Roundhouse Renewable Energy, LLC (Applicant) filed an Application for a Permit to construct and operate the Roundhouse Wind Energy Project (the Project) located 9 miles west of Cheyenne in Laramie County.  The Applicant proposes to construct a wind energy facility to produce up to 300 megawatts of energy.  The project components include up to 120 turbines, up to two substations, an operations and maintenance building, turbine access roads, an above and underground electrical collection system, and a 19-mile 230kV transmission line to the Platte River Power Authority Rawhide Substation in northern Colorado.  The project is located on 49,974 acres on City of Cheyenne, State of Wyoming and private lands in Laramie County.  The 17-month construction period is anticipated to commence in August 2019 and be completed by the end of 2020.  Construction manpower is anticipated to peak at 240 workers during August 2020.  The hearing on this matter is scheduled for June 13, 2019, in Cheyenne, Wyoming. 18-13


Resources

FileDate
File Date